In 24 hour shifts, three tunnels are being built in parallel in different directions on the so-called intermediate attack in Stuttgart Wangen. Mostly in blasting with 50 large machines from wheel loaders to drill trucks and lots of explosives. Since the workers are here directly under the city, vibrations on the surface must be avoided.
TRANSPARENT PROCESS – We introduce the Buyer to you for inspection – Negotiate the sale – Formalise the deal with a single sales agreement signed by all parties – Gather all requirements for the finance companies and ensure swift payment to the Seller before Buyer collects equipment.