Description
CE100 is a track-mounted Diamond Core Rig that was built in 2013. It has had a major rebuild completed over a 6 month period from October 2021 and completed in May 2022. Hours @ rebuild 551 hours. CE100 has been fully re-engineered and made to conform with Critical Control Safety Compliances for drill rig operations. NDT testing was completed @ time of the rebuild.
It runs a new CT14 Hydraulic operating system that is user-friendly and is maintenance interchangeable with readily available parts. Versatile and maneuverable with operator remote control handheld console. NQ, HQ, PQ Drilling capabilities. Up-to-date safety stop systems including safety cage lockout rotation and handheld remote emergency stop that shuts the rig down, not just to turn off the signal.
Ease of maintenance in all aspects of servicing and change out of parts. Engineered and compliant handrail and walkway system and access ladders. Full lighting for N/S operations. Certified FOPS on the driller platform. Running new Danfos Primary Hydraulic pump @ >3500 psi direct from John Deere 127hp-165hp engine.5.7-tonne main winch has been added with a certified 16mm winch rope. A new AMC main water pump <1000 psi with a PRV valve set @750 psi.
New Stryker 45ltr Certified Fire Suppression system installed. A UDR Rod Spinner has been engineered into the mast structure for the hands-free operation of tripping rods. A hydraulic-operated Breakout Spanner allows for the breakout of rod joins or subs. Tungsten inserts are interchangeable on Breakout Spanner. UDR Foot clamp assembly added for ease of maintenance and clamping of rod string





